Skip to content
PIS logoIntegrated protection professionally delivered

PIS Engineering Academy & Insights

Real problems.
Better engineering.

Go beyond the reading on the meter. Explore the failures, decisions and field lessons behind protection systems that work.

42 Real cases05 Engineering themes Evidence before assumption
Field note / 021Earthing & bonding
A transformer platform over seawaterEngineered approach for PIS-CS-021. Coordinate electrodes and conductors with marine exposure. Bond the platform, transformer and supplied structures intentionally. Verify fault duty, corrosion control and touch/step requirements. Conceptual teaching detail, not an as-built drawing or construction instruction. © PIS Engineering Academy · All rights reserved.PIS ENGINEERING / CASE 021A transformer platform over seawaterENGINEERED APPROACHREMOTE CABINMARINE PLATFORM / TRANSFORMER / SUPPLIED STRUCTUREExposure, corrosion, fault duty and touch/step conditions form one design.1231Coordinate electrodes andconductors with marineexposure.2Bond the platform,transformer and suppliedstructures intentionally.3Verify fault duty, corrosioncontrol and touch/steprequirements.READ THE DETAILEquipment, joints and current-path interfaces are shown in context.Conceptual teaching plate · no project dimensions or acceptance limits impliedPIS / REV 03© PIS Engineering Academy · All rights reserved

How Do You Ground a Transformer When There Is No Ground Beneath It?

Earthing a transformer above the sea

Every case begins with a better question.

Have a site challenge? Bring the evidence to our engineering team.

Talk to PIS