Cable management
Plan the hardware for a cable run from its supporting structure to the equipment terminal. PIS supplies clips, cleats, supports, cable terminals and repair sleeves.

Schedule the route by function
A cable list identifies what is being installed. A route drawing adds the information needed to choose the support, fixing and termination accessories for each section.

- Support the run
- Mark changes in level, direction and mounting surface. Identify where the project layout calls for cable supports.
- Secure the cable
- Give the cable outside diameter and arrangement at each fixing location. Use these details when requesting clips or cleats.
- Terminate or repair
- Identify the conductor section and terminal interface for cable ends. For a repair sleeve, include the conductor and the project’s repair specification.
Prepare your enquiry
Include these details when you contact the PIS engineering team.
Discuss this solution- Cable schedule with diameters and conductor sections
- Route drawing with cable arrangement and supports
- Terminal details, required accessories and quantities

